For cable elevator, Reinforced pulling cable grip, double sleeve

Operation of cable grip

Once all TRMD-A installed on ropes (a cable grip on the used cable + one cable grip on new cable), the pulling of the old rope by the kinematics of the installation resulting in traction phenomenon the establishing of the new cable.

2 meshes connected by 2 braids

Meshes are tightened (leg side) avoiding the cable passes through the mesh

 

tightened meshes

SWL: Safety Working Load with safety factor : 4

Load: value corresponding to the weight (cable ) between the ground and the first pulley of the drive, or the largest cable length in mounting position.

elevator maintenance